§ 28-363. Stormwater discharges from construction activities.  


Latest version.
  • Stormwater from sites upon which construction activities occur shall be controlled on-site using BMPs to protect water quality to the maximum extent practicable prior to discharge to the county's MS4 or to regulated waters. All erosion, pollution, and sediment controls required by any applicable local, state, or federal permit, including elements of a stormwater pollution prevention plan required under a NPDES permit, shall be properly implemented, installed, operated, and maintained. All stormwater discharges from construction sites shall be of a quality that will not adversely impact existing water quality or beneficial uses of the receiving waters.

(Ord. No. 2006-10, § 4.C., 6-20-06)