§ 23-208. Standards for waste disposal.  


Latest version.
  • (a)

    Sewage pump-out facilities for docks capable of supporting ten (10) or more vessels are required. Waste should be routed to a holding tank and pumped out at least weekly.

    (b)

    Septic tanks associated with new development shall not be installed within the riverine system or the required buffer.

    (c)

    No point source discharges will be allowed into the river unless the discharge meets AWT standards as permitted by the Department of Environmental Regulation.

    (d)

    Installation of hazardous or industrial waste facilities and their discharge is prohibited in the riverine system and any required buffer.

(Ord. No. 90-17, § 8, 8-23-90)